todo list

now that i'm seeing the light at the end of the drywall tunnel, i figured this would be a good time to run through the list of stuff that still has to be done on the studio, in roughly chronological order:

  • get rid of drywall/lumber/insulation debris that's slowly overtaking the basement. i've scheduled a junk pickup for monday
  • order another 20-ish pieces of drywall to finish the iso booths and other parts of the basement
  • finish drywalling iso booths and other parts of the basement
  • finish mudding, taping, foaming, and caulking (currently awaiting next acoustic caulk shipment)
  • order glass pieces for window (they'll have to be custom-cut)
  • install doors and windows
  • decide on and order ceiling lights for main studio
  • get the electrical work finished
  • install trim/moulding
  • paint
  • fix remaining ductwork noise problems (registers over mix area are still really noisy)
  • make absorption cloud and install over mix area
  • build soffits for main monitor speakers (maybe--still pondering this)
  • install flooring
  • perform room analyses
  • build necessary fixtures to tune room acoustics (hemholtz resonators, bass traps, absorption panels, etc.)
  • install main studio audio wiring and panels (microphone, midi, headphone)

then of course there's the whole lounge thing, and the whole bathroom thing, and god only knows what else. maybe, just maybe, i'll finish all of this before chinese democracy is released.