« first layer mud, tape, foam, and caulk done. | Main | first ceiling layer done »

major drywall progress this week

got lots of drywall work done this week. i rented a drywall lift mainly for doing the ceiling but also to help with the upper pieces of the second wall layer. the lift i got isn't great for doing walls, but it was certainly good enough:

IMG_0234.jpg

the second wall layer in the main room is all done now. not that it looks all that different from the first layer, but here's a pic anyway:

IMG_0241.jpg

today was all about ceilings. first the insulation:

IMG_0242.jpg

then the resilient channel:

IMG_0243.jpg

here's the drywall lift in action on the ceiling:

IMG_0244.jpg

and finally, here's what i got done with the ceiling before calling it a night:

IMG_0245.jpg

Post a comment