day o' fiberglass
ended up working solo today, which would've made it a bit difficult to do drywalling. so i focused on insulation stuff instead. i got insulation into most of the bays that jim and disco strapped yesterday, plus i strapped out some of the wackier bays. additionally, i got the idea yesterday that i should run all the between-room audio cabling along the floor between the room frames, which gave me the idea of adding a few little access panels to the spaces between the rooms in case i ever need to add/change wiring. i framed out one panel in the main room and two more in the iso/storage room, which will allow me to get at all the critical spaces between all the rooms.


al came by and applied his mad masonry skillz to getting the glass block installed in the bathroom. this involved knocking out a bunch of channeled blocks and brick sills and god only knows what else and then making the resulting hole a bit smaller so that the glass block would fit more snugly and not require an inch (or more) of mortar going all the way around. he also patched up the suboptimal mortaring job i did on the two bricks around the vent hood.


i need to go back and fix up the furring strips along that wall, but as soon as i've done that, all systems are go for drywalling the bathroom.