« the big order | Main | HVAC woes »

whole lotta drywall

delivery came today. 80 sheets of 5/8" is truly a massive amount of drywall. mine was the last delivery of the day, so everything on the truck was for me:

IMG_0113.jpg

normally they'll drop all deliveries right at the curb and i need to haul them up the driveway. but this dude was nice enough to bring stuff all the way up the driveway so it was just a few feet from the garage door.

IMG_0114.jpg

jim and disco came and helped me move everything into the house. i'm sooo glad both of them came; this stuff proved to be a beast to get into the studio. we found the easiest way to do it was 2 sheets at a time, which meant 40 trips back and forth. plus the 12 rolls of insulation and the 7 doors. so everything's in the house now, although i'm not sure i'll be able to do anything before we go to toronto.

in other news, gotta call the HVAC dude in the morning. i'm praying he'll have some good news for me.

Post a comment